###
DOI:
计算机系统应用英文版:2013,22(7):53-57
本文二维码信息
码上扫一扫!
企业级信息系统数据迁移
(国网电力科学研究院, 南京 211106)
Enterprise Information System Data Migration Solution
(State Grid Electric Power Research Institute, Nanjing 211106, China)
摘要
图/表
参考文献
相似文献
本文已被:浏览 1569次   下载 3044
Received:September 10, 2012    Revised:October 30, 2012
中文摘要: 随着当今社会信息化程度的提高, 企业的关键业务对信息系统的依赖性越来越大, 而科技的进步以及企业IT环境随业务需求发生的改变, 企业常常面临着对现有信息系统相关数据的迁移. 而数据迁移会带来用户业务的中断, 时间的浪费意味着机会的丧失, 所以要求系统迁移必须要迅速、准确. 电力企业信息科技发展迅速, 信息系统更新换代频繁, 因此如何保证系统间数据迁移方便、快捷、安全、可靠执行, 是电力企业信息部门的重要研究课题. 以企业级数据管理的角度, 详细分析了数据迁移过程的各个环节, 并综合电力系统数据迁移经验, 提出电力生产系统数据迁移方案, 对企业级信息系统数据迁移的执行有一定的参考价值.
Abstract:With the advancement of informationization in our society, the key business of enterprise rely on information system more and more. The progress of technology and change of IT environment of enterprise which is required by business, often force enterprisesfacing with the problem of existing information system data migration. Data migration brings interruption to the service of users, which is a waste of time that means losing opportunities, so it requires system data migration must be quick and accurate. Electric power enterprise information technology is developing rapidly, and the information systems update frequently, therefore how to ensure the system data migration convenient, fast, safe, reliable performance, is an important research topic of the information department in an electric power enterprise. In this paper, we made a detailed analysis of the data migration process in all aspects from the management of an enterprise data standpoint, integrated the experience of power system data migration, and put forward a solution of data migration of electric power production system, which has some reference value for the implementation of enterprise information system data migration.
文章编号:     中图分类号:    文献标志码:
基金项目:
引用文本:
吴淑玮,闫训超,曹齐.企业级信息系统数据迁移.计算机系统应用,2013,22(7):53-57
WU Shu-Wei,YAN Xun-Chao,CAO Qi.Enterprise Information System Data Migration Solution.COMPUTER SYSTEMS APPLICATIONS,2013,22(7):53-57